Extension Floor, Cobham

Location: Cobham, SurreyFloor Type: Engineered Oak — ExtensionArea: 52 m²Format: 180mm engineered oakFinish: Natural hardwax oilTimeline: 4 days installation
Extension Floor, Cobham

A substantial rear extension to a detached Cobham property — 52 square metres of new kitchen-diner and family room added to the rear of the house. The existing ground floor was already in engineered oak from a previous installation. The brief was to match it as closely as possible.

The Challenge

The existing floor was a 180mm wide engineered oak in a natural oiled finish, approximately four years old. Finding a precise match for an aged floor is always more difficult than matching new material. Samples were assessed in the property under natural light conditions at multiple times of day before a selection was made.

The Installation

The new extension floor sits on a concrete screed — glued installation throughout. The transition point between old and new floor was managed with a carefully positioned threshold at the original rear wall opening, allowing the two floors to butt together without a visible join at the junction. Both surfaces were then lightly re-oiled together to even out the colour difference between the original aged boards and the new installation.

The Result

The join between old and new floor is visible on very close inspection — as it will always be — but reads as a single coherent floor surface when viewed from any normal position in the room. The re-oiling of both surfaces together was the key step that unified the appearance.

← PreviousParquet Restored, Islington
"LIGNORA"
Like What You See

Let's Talk About
Your Project.

Every enquiry is reviewed personally. We'll come back to you within one working day.

Get a Quote → All Projects

Our Process

How This Project Was Installed

Every LIGNORA project begins with a home visit — we assess the subfloor, measure the space, discuss the brief, and bring sample candidates before writing a quote. This project was no different. The subfloor was assessed, moisture tested, and prepared before the floor was delivered to site for acclimatisation.

The floor was delivered to site and acclimatised in the property for the full required period before a single board was fixed. All LIGNORA floors are acclimatised in the actual conditions of the property — not in a van or garage. This is the single most important step in ensuring the floor performs across its lifetime.

Our installation team carried out the full job — subfloor preparation, installation, and on-site finishing — without subcontracting any element. The client received a seasonal installation warranty, written aftercare guidance, and a follow-up visit to confirm the floor had settled correctly.

Why Clients Choose LIGNORA

Own team only

No subcontractors on any LIGNORA installation. The people who quote the job are the people who lay it. Accountability from start to finish.

Acclimatisation without exception

Every floor is acclimatised in the property before installation. This is the step that determines long-term performance. We build it into every project schedule — it is never skipped.

Seasonal installation warranty

Every project comes with a seasonal warranty covering the installation through its first full temperature cycle. We follow up after installation to confirm the floor is performing as expected.