A promo code hides in plain sight — find it on our contact pageLuxury engineered oak — supplied, fitted & finishedFree swatch samples posted anywhere in the UKEvery enquiry answered within 24 hoursA promo code hides in plain sight — find it on our contact pageLuxury engineered oak — supplied, fitted & finishedFree swatch samples posted anywhere in the UKEvery enquiry answered within 24 hours
"PROJECT"
Residential

Solid Oak Throughout, Weybridge

Location: Weybridge, SurreyFloor Type: Solid European OakArea: 112 m²Format: 180 × 20mm solid oakFinish: Natural hardwax oil, site-appliedTimeline: 9 days installation
Solid Oak Throughout, Weybridge

Solid oak in a detached Weybridge property — a specification choice the client had been considering for several years. The existing suspended timber subfloor was in good structural condition and provided an ideal base for a secret-nailed solid installation.

The Case for Solid

The clients chose solid over engineered primarily because they wanted a floor that could be sanded multiple times over its lifetime. With two teenage children and plans to remain in the property for the long term, the ability to refresh the floor in ten or fifteen years without replacement was important to them. Solid oak, properly installed, will outlast the house.

The Installation

The 180 × 20mm solid European oak boards were acclimatised on-site for ten days before installation. The subfloor was checked for moisture, squared, and re-screwed where necessary. Boards were secret-nailed at 45 degrees through the tongue, working from a straight datum line established along the longest wall. The installation took nine days across the full ground floor.

The Result

The solid oak has the warmth and substance that engineered floors, however good, do not quite replicate. The floor creaks very slightly in one area — as all solid floors on suspended timber subfloors do — and the client was informed and accepting of this before installation. The hardwax oil finish was applied on-site in two coats with a light buff between.

← PreviousOak Staircase & Landing, EsherNext →Pale Oak Open Plan, Hackney
"LIGNORA"
Like What You See

Let's Talk About
Your Project.

Messages are answered personally — expect a reply within one working day. We keep it personal.

Get a Quote →All Projects

Our Process

How This Project Was Installed

It started on site in Weybridge, assessing the subfloor and measuring before anything else. We brought candidates to compare.

We delivered the floor to Weybridge and let it settle to the room before fitting began. This step is non-negotiable.

The Weybridge work was handled end to end by our installers, finishing included. One team throughout.

Why Clients Choose LIGNORA

Own team only

The team that priced this Weybridge job is the team that installed it. That is the whole point.

Acclimatisation without exception

Acclimatisation comes before fitting on every job; it decides how the floor behaves for years. It is built into every schedule.

Seasonal installation warranty

We back each install with a seasonal warranty and a post-installation check-in. Support doesn't stop at handover.

Our Installation Service →
Share this